濟(jì)南防水公司http://www.liveevil.cn/介紹一般情況下,保溫部位現(xiàn)場實(shí)際情況較復(fù)雜,在設(shè)計(jì)圖紙中很難詳細(xì)表示,專業(yè)隊(duì)伍必須繪出現(xiàn)場不同部位的保溫節(jié)點(diǎn)大樣圖,報(bào)有關(guān)單位認(rèn)可,方可展開施工。
1、濟(jì)南防水公司談到分格條施工不按要求開槽、鑲貼造成滲、漏水,外保溫墻面設(shè)置分格條主要為了克服保溫墻面連續(xù)面積過大,在高、低溫影響下容易開裂而采取的構(gòu)造措施。應(yīng)盡量減少分格條的設(shè)置,在分格條施工中應(yīng)使用專用開槽器將保溫板切成凹口,千萬不能將EPS板切透,然后進(jìn)行鑲貼。
Jinan waterproof construction company comes to sub-riffles not required grooving, veneered cause seepage, leakage, external insulation wall set points riffles main wall insulation in order to overcome the continuous area is too large,at high and low temperature impact and easy to crack to take structural measures. Should minimize the sub-grid bar, and in the sub-riffles construction should use a dedicated slot insulation board will cut notches, do not cut through the EPS board, then veneered.
2、濟(jì)南防水公司提醒在設(shè)計(jì)中,對(duì)于外保溫在女兒墻頂或窗臺(tái)處收口一般都不作特殊考慮,僅依賴保溫施工反包口加強(qiáng)。但實(shí)際施工和使用中,上述部位經(jīng)常會(huì)受到踩踏而破壞,從而造成滲、漏水。在上述部位外保溫收口處建議做混凝土或用保溫砂漿壓頂,然后加強(qiáng)網(wǎng)格布反包、抗裂砂漿抹面。
Jinan waterproof Company cautions in the design, external insulation for her daughter at the top of the wall or windowsill generally do not shut up special consideration, insulation construction depends only strengthen the anti-bag
mouth. But the actual construction and use, these parts are often subject to trampling and destruction, resulting in seepage and leakage. In the above thermal shut at the site suggested a concrete or mortar capping insulation and
strengthen anti-mesh bag, cracking mortar surface.
3、濟(jì)南防水公司建議外墻窗安裝有先塞口和后塞口兩種方法,在有外保溫施工的外墻面,由于收口不實(shí)或固定窗框打眼,易造成滲、漏水。為保證外墻窗洞收口質(zhì)量,減少滲漏點(diǎn),可以采用后塞口施工,以加強(qiáng)對(duì)洞口施工質(zhì)量的檢查、控制。外墻窗安裝時(shí)應(yīng)避免在窗框下口框體上直接打眼固定。
Jinan waterproof recommends facades windows installed after the first receptacle and gagged the two methods, the outer insulation construction of outer walls, due to the shut false or fixed sash drill, could easily lead to seepage,leaks. Facades or windows shut in order to ensure quality, reduce leaks after construction can be used gagged, in order to strengthen checks on the quality of construction openings, control. Avoid exterior walls should be installed in the opening window frame sash direct drilling under fixed.
4、濟(jì)南防水公司http://www.liveevil.cn/介紹后施工附墻雨水管、百葉窗、固定構(gòu)件等造成滲、漏水,應(yīng)在外保溫施工前提前做。
Jinan waterproof construction after the company introduced rainwater pipes attached to the wall, shutters, fixing member caused by seepage, leakage, should be done in advance before the outer insulation construction.